This drop, by a VLAT, was not long after my work with a T3 bucket ship. Good placement of the retardant to buy some time to allow the dozer time to get line in ahead of the fire.
Loading...
This drop, by a VLAT, was not long after my work with a T3 bucket ship. Good placement of the retardant to buy some time to allow the dozer time to get line in ahead of the fire.
You must be logged in to post a comment.
Yup that was a cool vid of that drop.